How to Apply for Madhya Pradesh Pollution Control Board Certificate

How to Apply for Madhya Pradesh Pollution Control Board Certificate.png

Introduction: Madhya Pradesh Pollution Control Board

The Madhya Pradesh Pollution Control Board has been vested with extensive power and duty under different condition enactments to forestall the contamination. M.P. Contamination Control Board by and by cares for the usage of the following Acts/Rules: 

  • Water (Prevention & Control of Pollution) Act, 1974
  • Air (Prevention & Control of Pollution) Act, 1981
  • Environment Protection Act, 1986 (certain sections)
  • Public Liability Insurance Act, 1991
  • Madhya Pradesh Jaiv Anaashya Apashista (Niyantran) Act & Rule

--------------Blog Contact Form-------------

The primary target of M.P. Contamination Control Board is to look after water, air and soil in solid and usable condition for different purposes. There are 6 Zonal Offices (Bhopal, Indore, Jabalpur, Gwalior, Ujjain and Rewa), 17 Regional Office, 2 Sub-Regional, outfitted with prepared staff and refined instruments, are continually keeping watch on ecological exercises in the state to accomplish the goals.

The Technical Presentation shall incorporate the following details: -

The Industries/Institutes/Mines are required to show up for Technical Presentation of their uses of CTE (Fresh)/(Expansion) CCA (Fresh)/CCA(Expansion) and for other consistence related issues. The introduction must be exact and extensive covering all applicable focuses as mentioned beneath. The Green businesses and Sand mines are not required specialized introduction for the above applications.

For CTE (Fresh/Expansion) applications [For Industries/Institutes]

  • Area of Project on Google Map and Photograph of the site.
  • Scope and Longitude
  • Existing Site determination subtleties, for example, River, Lake, Forest, Human settlement and so on,
  • Endorsed Layout Plan
  • Crude materials and items.
  • Assembling process.
  • Wellspring of water and Water Consumption in various utilization. Water Balance.
  • Wellsprings of contamination (Air, Water, Hazardous and Solid waste and so forth.)
  • Specialized subtleties of adequacy of treatment and removal offices of Air, Water, Hazardous and Solid wastes. (Please guarantee the nearness of specialized individual/expert for conversation)
  • Design Plan of Effluent Treatment Plant with subtleties
  • Contamination control measures proposed according to the proposals of EMP and conditions given by MoEF in letter of Environmental Clearance. (Assuming any)

For CCA (Fresh/Expansion) applications [For Industries/Institutes]

  • Point astute consistence of states of Consent to Establish.
  • Genuine photos of the Project
  • Photos of Effluent Treatment Plant, Sewage Treatment Plant, Boiler Stack, Air Pollution Control Equipment (Cyclone, Bag Filter, ESP and so forth), Water Meter, Plantation and so on
  • Specialized subtleties of treatability and suitability of treatment and removal offices of Air, Water, Hazardous and Solid wastes. (Please guarantee the nearness of specialized individual/expert for conversation)
  • For CTE (Fresh/Expansion) applications [For Mines]
  • Area of Project on Google Map. Genuine Photograph of the site.
  • Scope and Longitude
  • Existing Site determination subtleties, for example, River, Lake, Forest, Human settlement and so on,
  • Endorsed calculated Plan,
  • Mining Process.
  • Item and Production limit
  • Wellspring of water and Water Consumption in various utilization. Water Balance.
  • Wellsprings of contamination (Air, Water, Hazardous and Solid waste and so forth.)
  • Specialized subtleties of adequacy of treatment and removal offices of Air, Water, Hazardous and Solid wastes. (Please guarantee the nearness of specialized individual/expert for conversation)
  • Contamination control measures proposed according to the proposals of EMP and conditions given by MoEF in letter of Environmental Clearance.

For CCA (Fresh/Expansion) applications [For Mines]

  • Point insightful consistence of states of Consent to Establish.
  • Genuine photos of the Fugitive outflow control courses of action (Conveyor framework/Pucca Road/Water sprinkling framework) Over Burden Dump management, Gabion Wall/Retaining divider, Garland Drain, Settling Tank, ETP/STP, Plantation and so on
  • Specialized subtleties of treatability and suitability of treatment and removal offices of Air, Water, Hazardous and Solid wastes. (Please guarantee the nearness of specialized individual/expert for conversation)
  • All the data including, information, pictures and different reports must be obviously noticeable

Documents Required for Madhya Pradesh Pollution Control Board (MPPCB) Orange and Green Category: -

  • Authorized Person Pan card
  • Authorized Person Aadhar card must be linked with updated Mobile No.
  • Pan card of the unit  in case of Partnership/Company
  • Authorization letter (except Proprietorship)
  • Municipal/Industry license
  • Factory/Trade/health Trade License
  • Proof of registration of the Unit
  • CA Letter for total project cost
  • Site Plan
  • FSSAI Certificate for food businesses
  • Electricity bill
  • Proof of Ownership
  • Water Bill
  • GST Certificate

This portion of the site is for informational purposes only. The content is not legal advice. The statements and opinions are the expression of author, not corpseed, and have not been evaluated by corpseed for accuracy, completeness, or changes in the law.

BOOK A FREE CONSULTATION

Get help from an experienced legal adviser. Schedule your consultation at a time that works for you and it's absolutely FREE.

Author

Experienced Digital Marketer with a demonstrated history of working in the Internet industry. He likes to write about the latest technology trends, Skilled in Digital Marketing likes. Search Engine Optimization, SMO, SEM, PPC, Content Writing, ...

Learn More >>