
Standard Guidelines for the Issuance of the Health Certificate for Fishery Products meant for Export to the countries of the European Union
by Vipan Singh on 2021-08-06
Standard Guidelines for the Issuance of the Health Certificate for Fishery Products meant for Export to the countries of the European Union

Procedure Of Payment Bank License
by Dheeraj Budhori on 2021-08-06
Payment bank is a new model of banks conceptualized by the Reserve Bank of India (RBI). Payment banks can accept a restricted deposit, which is currently limited to 1 lakh per customer and may be increased further. Loans and credit cards can’t be issued by this type of bank. Current account and savings accounts can be operated by such banks.
_by_the_Uttar_Pradesh_State_Pollution_Control_Board-corpseed.webp)
Procedure for carrying out inspection (industry category wise) by the Uttar Pradesh State Pollution Control Board
by Vipan Singh on 2021-08-06
The inspection team usually comprises of one or more officers, as the case may be, to carry out the inspections under the provisions of vivid environmental legislations

Procedure for obtaining Consent to Operate under Water Act, 1974 & Air Act, 1981 and Authorization under Hazardous & other waste (M&TM) rules, 2016
by Shamshad Alam on 2021-08-06
Procedure for obtaining Consent to Operate under Water Act, 1974 & Air Act, 1981 and Authorization under Hazardous & other waste (M&TM) rules, 2016

What structure a merchant banker provide in India?
by Vinay Singh on 2021-08-06
Merchant banker is a company and is combination of consultancy and banking services. Activities of merchant banker in India are regulated by SEBI (merchant banker) rule 1992
_from_Haryana_State_Pollution_Control_Board_corpseed.webp)
Documents Required for Consent to Operate (CTO) from Haryana State Pollution Control Board
by Vipan Singh on 2021-08-06
Detail of Effluent Treatment Plant (ETP)/Sewage Treatment Plant (STP), Adhesive Prepregs for Composite Manufacturers (APCM), acoustic enclosure, Hazardous Waste Management Facilities installed in the unit along with their size, specification and capacity.