Corpseed

TEC Revised Standards 2026 for Cellular Towers and Trunk Media Gateway: What Telecom Businesses Need to Review

Department: Department of Telecommunications (DoT)Authority: Telecommunication Engineering Centre (TEC)Publish: Applicable: 18-09-2026Product Quality ComplianceStandards and Certifications

Quick note

Below is the official summary and the reference document preview. Use “Open PDF” for full screen view.

Schedule a Call Back

IN +91

Summary

The Department of Telecommunications has brought two revised Telecommunication Engineering Centre standards into effect for specific telecom equipment. The change covers 40, 30 and 20 metre towers used for cellular systems and the Test Guide for Trunk Media Gateway.

S.O. 5178(E) is dated 18th September, 2026, and has been made by the Ministry of Communications through the Department of Telecommunications and Telecommunication Engineering Centre (TEC). It is based upon the provisions of Section 19 of the Telecommunications Act, 2023, along with Rule 5 of the Telecommunications (Framework to Notify Standards, Conformity Assessment and Certification) Rules, 2025.

Two revised documents are named in the Gazette:

  • TEC 45070:2026 – Generic Requirements for 40, 30 and 20 metre towers for cellular systems
  • TEC 59061:2026 – Test Guide for Trunk Media Gateway

For manufacturers, telecom infrastructure companies and technical teams, the practical issue is not simply that two new numbers have appeared. The more useful question is whether existing specifications, testing references, purchase documents, quality records, or certification files still point to an older version of the relevant TEC standard.

Notification at a Glance

Particular Details
Issuing Ministry Ministry of Communications
Department Department of Telecommunications
Technical body Telecommunication Engineering Centre
Notification number S.O. 5178(E)
Notification date 18 September 2026
Gazette issue date 21 September 2026
Governing law Telecommunications Act, 2023
Relevant provision Section 19
Related rules Telecommunications (Framework to Notify Standards, Conformity Assessment and Certification) Rules, 2025
Relevant rule Rule 5
Revised standard 1 TEC 45070:2026
Revised standard 2 TEC 59061:2026
Equipment covered 40, 30 and 20 metre cellular-system towers and Trunk Media Gateway.
File number F. No. 24-01/2025-STD/TEC
Separate transition period Not expressly specified in the notification
Separate compliance deadline Not expressly specified
Application procedure Not provided in this notification
Fee Not specified
Specific penalty Not specified

The Gazette is short and focused. It notifies the revised standards it does not provide a complete certification procedure, fee schedule, transition mechanism, or testing workflow.

What Has TEC Actually Changed Through This Notification?

TEC has not introduced a new telecom licence through S.O. 5178(E). Nor does the Gazette create an entirely new registration system.

Its direct effect is more limited: the Central Government has notified revised technical standards for two categories of telecommunication equipment.

That distinction matters because a revised technical standard and a new licensing regime are not the same thing.

A manufacturer may still need to examine how the revised standard affects an existing certification, test report, or conformity-assessment requirement. Still, those consequences cannot automatically be assumed from this two-page Gazette alone.

The Legal Framework Behind the Revised TEC Standards

Section 19 of the Telecommunications Act, 2023

The notification expressly says that the Central Government is exercising powers under Section 19 of the Telecommunications Act, 2023.

For businesses reading this update, the main takeaway is that this is a formal government notification issued under the telecom law. It should therefore be treated differently from an informal technical note or industry recommendation.

At the same time, the Gazette should not be stretched beyond what it actually says. It notifies the standards but does not reproduce every obligation that may arise under the wider telecom compliance framework.

Rule 5 of the 2025 Framework Rules

S.O. 5178(E) also refers to Rule 5 of the Telecommunications (Framework to Notify Standards, Conformity Assessment and Certification) Rules, 2025. This tells us that the revised standards sit within the broader regulatory structure for standards, conformity assessment and certification. However, the present notification does not itself lay down a new application form, new certificate validity period, or separate certification procedure.

Where Does TEC Fit In?

The notification has been issued through the Telecommunication Engineering Centre, which operates under the Department of Telecommunications.

For a business dealing with equipment covered by these standards, TEC is therefore the relevant technical reference point for understanding the detailed specifications.

The Gazette identifies the revised standards. The actual technical requirements need to be read from the relevant TEC documents themselves.

Which TEC Standards Have Been Revised?

Standard Nature of Document Equipment Covered
TEC 45070:2026 Generic Requirements 40, 30 and 20 metre towers for cellular systems
TEC 59061:2026 Test Guide Trunk Media Gateway

Both standards are specifically described as revised standards for telecommunication equipment.

The Gazette does not reproduce the technical clauses inside these standards. It also does not give a side-by-side comparison with their previous editions.

TEC 45070:2026 for 40, 30 and 20 Metre Cellular Towers

What Does TEC 45070:2026 Cover?

The Gazette identifies TEC 45070:2026 as the Generic Requirements document for:

  • 40 metre towers
  • 30 metre towers and
  • 20 metre towers
  • used for cellular systems.

The wording is specific. Businesses should therefore avoid treating this notification as if it automatically covers every possible telecom tower.

If a company manufactures, procures, or supplies a tower outside the stated description, applicability should be checked from the full TEC standard rather than assumed.

What Should Tower Manufacturers Review?

A manufacturer dealing with one of the covered tower heights should start by checking where the existing TEC standard is already being used.

Typical review points may include:

  • engineering drawings
  • product specifications
  • design documents
  • internal quality plans
  • inspection records
  • testing references
  • supplier specifications
  • purchase requirements
  • technical schedules and
  • certification-related records, where applicable.

This does not mean every document automatically has to be changed. The sensible first step is to identify the current standard reference and then compare it with the revised TEC document.

Do We Know the New Technical Parameters?

Not from this Gazette alone.

S.O. 5178(E) tells businesses which revised standard has been notified, but it does not set out structural values, load conditions, materials, foundations, dimensions, test parameters, or other engineering requirements.

Any detailed technical comparison has to come from TEC 45070:2026 itself and, where necessary, the earlier applicable edition.

TEC 59061:2026 Test Guide for Trunk Media Gateway

What Does the Gazette Say?

The second revised standard is TEC 59061:2026, described as a Test Guide for Trunk Media Gateway.

This makes testing a clear area for review, particularly for manufacturers, technical teams, and quality personnel working with the covered equipment.

Does This Mean Every Existing Product Must Be Retested?

The Gazette does not say that.

Calling TEC 59061:2026 a “Test Guide” does not, on its own, amount to an instruction that every existing Trunk Media Gateway must undergo fresh testing immediately.

Before planning retesting, a business should check:

  • which standard is mentioned in its current test report
  • whether the existing product remains unchanged
  • whether a certification or conformity-assessment framework applies
  • whether a separate TEC direction addresses migration to the revised standard and
  • whether new testing is required for future applications, modifications or approvals.

This difference is commercially important. Unnecessary testing costs can arise when businesses treat every standard revision as an automatic retesting order.

Who Is Likely to Be Affected?

The Gazette names equipment, not a long list of regulated entities. Business impact therefore depends on what a company manufactures, supplies, tests, purchases, or uses.

Stakeholder Why the Update May Matter Main Area to Review
Cellular tower manufacturers Covered tower heights are named in TEC 45070:2026 Design and technical references
Tower suppliers Product documents may carry TEC references Supplier and product specifications
Telecom infrastructure companies May procure covered towers Project and procurement documents
Trunk Media Gateway manufacturers TEC 59061:2026 directly concerns this equipment Testing and technical files
Telecom operators May purchase or specify covered equipment Procurement and vendor standards
Testing teams Revised Test Guide may affect technical references Test plans and reports
Quality teams Internal records may use an older TEC version Quality documents and SOPs
Compliance teams Need to assess certification/conformity implications Compliance records
Procurement teams Purchase documents may still contain older references Technical specifications

This should not be read as a statement that every telecom business now has the same legal duty. Applicability needs to be established product by product.

When Do the Revised TEC Standards Take Effect?

This is one of the more important points in the notification.

The document itself is dated 18 September 2026, but it says that the revised standards take effect from the date of publication of the notification in the Official Gazette.

The Gazette issue carrying S.O. 5178(E) is dated 21 September 2026.

That makes 21 September 2026 the operative date under the wording used in the notification.

Why the Two Dates Should Not Be Mixed Up

Event Date What It Means
Notification dated 18 September 2026 Date written on the notification
Gazette publication 21 September 2026 Date of publication in the Official Gazette
Operative date 21 September 2026 Notification links effectiveness to Gazette publication

For regulatory content, this distinction matters. A document's signing or notification date should not automatically be treated as its effective date where the commencement clause says otherwise.

Is There a Transition Period?

The notification does not expressly specify a separate transition period.

There is no 30-day, 90-day, or six-month grace period written into S.O. 5178(E).

It also does not provide a separate future compliance date for businesses currently working with an earlier edition.

That means companies should not create their own transition assumptions. If TEC issues or has issued a separate implementation direction for a particular certification or testing process, that document should be checked independently.

What About Existing Equipment, Certificates and Approvals?

This Gazette does not explain grandfathering.

In practical terms, it does not tell businesses whether every approval issued under an earlier edition:

  • continues without change
  • needs a technical review
  • requires modification or
  • has to be replaced.

It would therefore be equally risky to say “all old approvals remain valid” or “all old approvals are invalid”.

The correct approach is to review the approval or certification framework that applies to the equipment and check whether TEC has issued any separate transition instructions.

What Can Be Confirmed as Changed?

The Gazette allows a few clear conclusions.

1. A Revised Cellular Tower Standard Has Been Notified

TEC 45070:2026 now appears as the notified Generic Requirements document for 40, 30 and 20 metre towers used for cellular systems.

2. A Revised Trunk Media Gateway Test Guide Has Been Notified

TEC 59061:2026 has been notified as the Test Guide for Trunk Media Gateway.

3. The Effective Date Is Linked to Gazette Publication

The standards take effect from publication of S.O. 5178(E) in the Official Gazette.

4. The Gazette Does Not Describe the Technical Differences

It does not list old clauses and revised clauses.

This last point is important because businesses should not present a “new requirement” unless they have actually compared the previous and revised standard documents.

Old Standard vs Revised 2026 Standard: What Can Businesses Compare?

A proper old-versus-new table cannot be created from S.O. 5178(E) alone.

The notification identifies the revised standard but does not reproduce the previous edition or explain each technical modification.

Once both editions are available, businesses can review areas such as:

Scope

Check whether the equipment or product category covered by the standard has changed.

Definitions

Look for any change in technical terms or product classifications.

Technical Parameters

Compare measurable specifications only from the actual standards.

Testing Method

Check whether the procedure, test sequence, equipment, or conditions have changed.

Acceptance Criteria

A revised pass/fail or performance requirement can directly affect testing and product assessment.

Referenced Standards

One TEC revision may also change the version of another technical standard referred to inside the document.

Documentation Requirements

Manufacturers should check whether drawings, reports, declarations, or technical records have changed.

These are areas to examine, not confirmed changes in S.O. 5178(E).

Does the Notification Create a New Certification Requirement?

No separate new certification scheme is set out in this notification.

The enabling rules are concerned with standards, conformity assessment and certification, but S.O. 5178(E) itself focuses on notifying revised standards.

When an organization has been working under some certification or conformity assessment obligation for telecommunications, however, the actual question differs:

Is the new standard impacting the validity of the current certificate, testing, and technical documentation that was used for the product?

The answer will depend on the regulatory framework in place.

Impact on Existing Test Reports

A revised standard does not automatically make every old test report useless.

A better approach is to review the report carefully.

Check the Standard Number

Look at the exact TEC number printed in the report.

Check the Edition

A report referring to an earlier edition may need further review once a revised standard becomes applicable.

Check Product Scope

Confirm that the report actually relates to the same product, model, or equipment now under review.

Check the Purpose of the Report

A test report used only for an internal quality check may be treated differently from one submitted as part of a regulatory certification process.

Check for Separate TEC Directions

If a transition, migration, or acceptance instruction exists, that will usually be more useful than making assumptions from the Gazette alone.

Impact on Technical Documents

Technical documentation tends to carry old standard references long after a revision takes place.

Businesses should therefore search for the relevant TEC number across their internal records.

Documents worth checking include:

  • drawings
  • engineering specifications
  • technical data sheets
  • standard operating procedures
  • quality manuals
  • test plans
  • inspection records
  • laboratory reports
  • supplier specifications
  • customer specifications
  • tender documents
  • purchase orders
  • approval files and
  • certification records, where applicable.

The objective is not to rewrite every file. It is to find where the old reference matters and update only what genuinely needs to change.

Impact on Telecom Procurement and Vendor Management

Procurement teams are often the last place where an old standard reference gets noticed.

A purchase specification written several months earlier may still mention an older edition even after a revised standard has taken effect.

  • For upcoming procurement involving the equipment covered by S.O. 5178(E), businesses can check:
  • the TEC version written in the tender
  • standard numbers in technical schedules
  • vendor declarations
  • supplier test records
  • equipment data sheets and
  • quality requirements attached to purchase orders.

Existing contracts should not automatically be amended solely because of this notification. Contractual and technical relevance has to be checked first.

Business Impact by Stakeholder

Cellular Tower Manufacturers

Manufacturers of 20, 30 and 40 metre towers used for cellular systems have the clearest reason to review TEC 45070:2026.

Their work may include:

  • checking the applicable standard version
  • comparing technical requirements
  • reviewing engineering documentation
  • checking internal quality controls
  • reviewing supplier specifications
  • checking testing requirements, where applicable and
  • assessing whether any certification file needs attention.

Trunk Media Gateway Manufacturers

The focus here is more likely to fall on testing.

Manufacturers should review:

  • current Test Guide references
  • existing test plans
  • earlier test reports
  • product technical files
  • certification documentation and
  • any new testing scheduled after the revised standard became applicable.

Telecom Operators

An operator may not manufacture the equipment but can still encounter these standards during procurement or technical acceptance.

The operator's review may therefore centre on:

  • purchase specifications
  • equipment approval requirements
  • supplier technical documentation
  • project schedules and
  • vendor compliance records.

Telecom Infrastructure Companies

Infrastructure companies dealing with the covered cellular towers should check whether project specifications and engineering documents refer to the latest applicable TEC requirement.

Testing and Quality Teams

These teams should not wait for an audit to discover an outdated standard reference.

Useful checks include:

  • standard mapping
  • test procedure references
  • test report versions
  • quality-plan references
  • inspection criteria and
  • technical-file consistency.

Procurement and Compliance Teams

Procurement may know which standard a vendor promises to follow, while compliance may know which version is currently applicable. Bringing those two views together can prevent a situation where a technically outdated specification becomes part of a new purchase order.

What the Gazette Does Not Tell Businesses

This is where the notification needs to be read carefully.

Issue Position Under S.O. 5178(E)
Separate transition period Not expressly specified
Future compliance deadline Not expressly specified
Application process Not provided
Application portal Not provided
Required application documents Not provided
Government fee Not specified
Testing fee Not specified
Certification fee Not specified
Mandatory retesting of all existing equipment Not stated
Certificate validity period Not stated
Renewal procedure Not stated
Grandfathering arrangement Not stated
Treatment of all existing approvals Not stated
Specific penalty Not stated
Technical clauses inside revised standards Not reproduced

These missing details should not be filled with generic telecom-compliance assumptions.

Compliance Review Checklist for Telecom Businesses

The following checklist is best treated as an internal review tool rather than a direct reproduction of statutory duties.

Review Area What to Check Team Usually Involved
Product applicability Is the equipment actually covered? Technical + Compliance
TEC version Which standard edition is currently being used? Quality + Compliance
Engineering files Do drawings or specifications cite the older edition? Engineering
Test reports Which standard and version were used? Testing + Quality
Certification records Is an affected standard referenced? Compliance
SOPs Are obsolete references still present? Quality
Supplier documents Which standard does the vendor follow? Procurement + Quality
Tenders Is the correct standard edition specified? Procurement
Upcoming tests Which Test Guide is planned? Testing
Regulatory monitoring Has TEC or DoT issued separate directions? Compliance

What Manufacturers Should Check First

For manufacturers, a practical review starts with the product file.

Standard Reference

Find the exact TEC number currently used.

Standard Edition

Check whether the year or revision matches the currently notified standard.

Drawings and Specifications

Do not update drawings simply because the Gazette has been published. First confirm whether the technical clause affecting that drawing actually changed.

Test Reports

Review the standard edition and purpose of each report.

Quality Plan

Any inspection or acceptance criterion tied to an older TEC requirement should be flagged for technical review.

Supplier Documents

A manufacturer cannot keep its own documents current if a critical supplier continues to work from an outdated specification.

What Telecom Operators and Infrastructure Companies Should Review

Operators and infrastructure companies can focus on the point where technical requirements enter procurement and projects.

Useful documents to check include:

  • equipment procurement specifications
  • project technical schedules
  • vendor submissions
  • approved vendor requirements
  • tower specifications
  • internal equipment standards
  • future purchase orders and
  • acceptance documentation.

This is particularly relevant where procurement is being planned after 21 September 2026.

What Testing and Quality Teams Should Review

Testing and quality teams should verify the standard before new work begins.

A simple pre-test check can cover:

  • applicable TEC number
  • edition/year
  • product scope
  • testing procedure
  • report template
  • acceptance criteria
  • certification purpose and
  • supporting technical documents.

For Trunk Media Gateway work, the revised TEC 59061:2026 Test Guide is the central reference identified by the Gazette.

Cost and Operational Impact

S.O. 5178(E) does not specify a fee or implementation cost.

The actual business cost, if any, will depend on what the revised standard changes and how deeply the older version is embedded in the company's systems.

Possible cost areas can include:

Engineering Review

Technical teams may need time to compare the relevant standards.

Document Updates

Changes may be required in specifications, drawings, procedures, or quality records.

Testing

Additional testing could create laboratory and coordination costs where the applicable framework requires it.

Procurement Changes

Specifications and supplier documents may have to be updated for future purchases.

Compliance Support

Some companies may need external telecom regulatory compliance services where they do not have in-house resources to interpret the notification, standards, and related conformity-assessment requirements.

These are potential cost areas, not fees imposed by S.O. 5178(E).

Why Working With the Correct TEC Standard Matters

Using an outdated technical reference can create problems even before it becomes a formal enforcement issue.

For example, engineering may be working on one edition while procurement requests another. The supplier may submit a report against a third version.

Keeping the standard reference aligned helps reduce this kind of mismatch.

It can also improve:

  • technical document control
  • consistency between departments
  • supplier communication
  • testing preparation
  • procurement accuracy and
  • regulatory readiness.

None of these outcomes should be treated as a guarantee of certification or approval.

Risks Businesses Should Avoid

Assuming the Notification Date Is the Effective Date

The notification is dated 18 September, but its own wording links commencement to Gazette publication.

Treating Every Existing Test Report as Invalid

There is no blanket statement to that effect in S.O. 5178(E).

Assuming a Grace Period Exists

No separate transition period is stated.

Updating Documents Without Reading the Revised Standard

A standard number alone does not show which technical clauses have changed.

Relying Only on a Third-Party Summary

Technical decisions should ultimately be based on the applicable TEC document and official government directions.

Ignoring Procurement Records

An outdated standard can remain in tenders and purchase specifications even after technical teams have moved to a newer edition.

Internal Questions Worth Answering Now

A business reviewing this notification should be able to answer the following:

  • Do we manufacture, supply, buy, test, or use the equipment named in S.O. 5178(E)?
  • Which TEC version appears in our current technical files?
  • Are existing test reports based on an earlier edition?
  • Does any certificate or approval refer to the older standard?
  • Are suppliers using the same standard edition as our internal team?
  • Do current procurement documents mention the correct TEC reference?
  • Is any new testing scheduled using an older guide?
  • Has TEC issued a separate transition or implementation instruction?

These questions usually reveal whether the update is a small documentation exercise or something that needs a deeper technical review.

A Practical Roadmap for Moving to the Revised Standard

Step 1: Check Whether the Product Is Covered

Do not start with a company-wide compliance exercise. Start with the equipment.

Step 2: Check for Current Standard References

Review engineering, testing, quality, compliance, and procurement documentation.

Step 3: Get a Copy of the Revised TEC Document

The Gazette provides the name and number, but not the entire set of technical requirements.

Step 4: Compare Relevant Sections

Consider only those sections that directly impact the technical requirements related to the product being made by the company or to the testing that is being done.

Step 5: Check Testing Documentation

Confirm whether the existing testing documentation fulfills the requirements for the business in question.

Step 6: Review Certification/Conformity Assessment

If relevant, consider whether the revision to the standard impacts future or existing submission documentation.

Step 7: Review Vendors and Procurement

Ensure that suppliers and purchasing are not referencing the old standard.

Step 8: Amend Controlled Documentation

Do not amend internal documentation until the technical position has been confirmed.

Step 9: Monitor for Official TEC and DoT Information

Future clarification or direction could impact implementation efforts.

What Should Businesses Monitor Next?

The present Gazette answers the question of which revised standards have been notified.

It does not answer every operational question that may arise after a standard revision.

Businesses dealing with the affected equipment should monitor official sources for any later communication concerning:

  • transition arrangements
  • conformity assessment
  • certification
  • testing
  • treatment of previous reports
  • implementation directions
  • corrigenda or
  • further amendments.

This is particularly important before spending money on fresh testing or starting a new certification exercise solely because of the Gazette notification.

Business Opportunities Around the Revised Standards

A technical-standard change can create work beyond regulatory filings.

Manufacturers, suppliers and telecom companies may need assistance with:

  • standards applicability reviews
  • old-versus-new technical assessment
  • testing-document review
  • compliance gap assessment
  • supplier checks
  • technical-file updates
  • conformity-assessment support and
  • procurement specification review.

This creates relevance for technical compliance consulting and telecom regulatory compliance services, particularly for businesses that do not maintain a dedicated telecom compliance team.

The Gazette itself does not provide market projections or estimate commercial demand.

What Businesses Should Do Now

A practical response does not need to start with fresh testing or certification.

Start with the basics:

  • Confirm whether TEC 45070:2026 or TEC 59061:2026 applies to the equipment handled by the business.
  • Find the TEC standard currently referenced in internal files.
  • Obtain and read the revised standard.
  • Identify actual technical or testing changes.
  • Review existing reports and approvals rather than assuming their status.
  • Check supplier and procurement documents.
  • Examine conformity-assessment and certification implications where applicable.
  • Monitor official TEC and DoT communications.

This approach avoids both extremes: ignoring a revised standard completely or spending time and money on actions that may not be required.

How Corpseed Can Help With TEC and Telecom Equipment Compliance

The understanding of a new TEC standard usually goes beyond reading the two pages of the Gazette. A company needs to link the notification with technical documentation, existing reports, procurement documents, and conformity assessment procedures for its equipment.

Corpseed provides telecom regulatory compliance services and technical compliance support for businesses that need help assessing these issues.

TEC Standard Applicability Review

Corpseed can assist businesses in checking whether TEC 45070:2026 or TEC 59061:2026 is relevant to the equipment they manufacture, supply, procure, or use.

The review can help avoid unnecessary compliance work where the product falls outside the notified scope.

Technical Compliance Gap Assessment

Where the revised standard is relevant, Corpseed can help identify areas where existing internal references may require attention.

The review may cover:

  • standard version
  • product specifications
  • test references
  • quality records
  • supplier documents and
  • compliance files.

Technical Documentation Review

Manufacturers may have the same TEC reference appearing across several documents.

Corpseed can support a structured review of specifications, product files, testing references, quality documents, and procurement records so that outdated references can be identified before changes are made.

Existing Test Report Review

An older report should not automatically be discarded.

Corpseed can assist businesses in reviewing:

  • the standard used in the report
  • edition/year
  • product scope
  • testing purpose and
  • regulatory relevance.

Any final acceptance of the report will depend on the applicable regulatory or certification framework.

Product Testing and Laboratory Coordination

Where the applicable telecom compliance framework requires testing, Corpseed can assist businesses in understanding the requirement and coordinating the testing process with the relevant laboratory.

The need for testing should first be established. S.O. 5178(E) should not be treated as a blanket fresh-testing instruction.

Conformity Assessment and Certification Support

Where certification or conformity assessment applies to the equipment, Corpseed can help businesses understand the relevant process, supporting records, and the effect of the revised TEC reference.

Procurement and Supplier Compliance Review

Technical compliance is not limited to manufacturing records.

Corpseed can also assist businesses in reviewing standard references appearing in vendor submissions, tenders, purchase requirements, and technical specifications.

Ongoing Telecom Regulatory Compliance Support

Regulatory work often continues after the first notification.

Businesses can use Corpseed's telecom regulatory compliance services to track relevant TEC and DoT communications and assess whether later instructions affect testing, documentation, certification, or procurement.

For manufacturers and telecom businesses handling the equipment covered by S.O. 5178(E), the priority should be to establish the actual impact first and take action only where the revised standard or wider compliance framework requires it.

Key Takeaways

The Government has formally notified two revised TEC standards under S.O. 5178(E):

  • TEC 45070:2026 covers Generic Requirements for 40, 30 and 20 metre towers for cellular systems.
  • TEC 59061:2026 is the revised Test Guide for Trunk Media Gateway.
  • The notification is dated 18 September 2026.
  • The Gazette issue is dated 21 September 2026, and the notification links its effectiveness to publication in the Official Gazette.
  • No separate transition period is set out in the notification.
  • No blanket direction requiring fresh testing of all existing equipment is stated.
  • The Gazette does not explain the clause-wise technical differences between the previous and revised standards.
  • Businesses should begin by reviewing applicability, standard references, technical documents, test reports, and procurement records.

Document Preview

Embedded reference document

Fullscreen ↗

Related

Explore more updates from the same department.

Call