Under the GPCB CETP Hydraulic Load Transfer Protocol 2026, any proposed transfer must be examined against the CETP's existing consented hydraulic capacity, inlet pollution load and membership records. The transfer must not increase the treatment plant's total consented hydraulic capacity or the pollution load entering the facility. Both the transferring and receiving industries must also apply for the necessary amendments to their environmental consents.
The protocol applies to all CETPs in Gujarat and takes immediate effect from the date of the office order. It also governs changes to the Base Membership List maintained by CETPs. Industries planning to transfer effluent treatment capacity or CETP membership should review these requirements before submitting their applications.
GPCB CETP Hydraulic Load Transfer Protocol 2026 at a Glance
| Particulars | Details |
|---|---|
| Issuing authority | Gujarat Pollution Control Board |
| Document type | Office Order |
| Letter number | GPCBHO/0001/09/2026 |
| Approval date | 10 September 2026 |
| Subject | Protocol for Hydraulic Load Transfer in Common Effluent Treatment Plants |
| Applicable state | Gujarat |
| Applicable entities | All CETPs in Gujarat and industries involved in hydraulic load or membership transfers |
| Main purpose | Standardise transfer applications and related CTE and CCA amendments |
| Application authority | CETP Governing Body |
| Technical evaluation | Regional Hydraulic Load Transfer Committee |
| Decision-making body | CETP Governing Body |
| Hydraulic capacity condition | No increase in total consented CETP hydraulic capacity |
| Pollution load condition | No increase in pollution load at the CETP inlet |
| Membership records | Updated list to be submitted to GPCB |
| Consent amendments | Required applications from both transferor and transferee |
| Effective date | Immediate effect from the order |
| Application fees | Not specified |
| Processing timeline | No fixed time limit specified |
| Regulatory references | Water Act, 1974, and MoEFCC Notification S.O. 3864(E), dated 9 September 2024 |
What Is the GPCB CETP Hydraulic Load Transfer Protocol 2026?
The GPCB CETP Hydraulic Load Transfer Protocol 2026 is a regulatory procedure for transferring already allotted or booked hydraulic load from one industry to another member industry of a Common Effluent Treatment Plant. The protocol also covers transfers of CETP membership and the associated changes in environmental consents. Its main purpose is to standardise how these requests are considered by CETP authorities and the Gujarat Pollution Control Board.
A CETP receives industrial wastewater from multiple member units for treatment. Each member industry may have an allotted or booked hydraulic load representing its share of the plant's wastewater handling capacity. When one industry wishes to transfer this allocation to another, the arrangement must be reviewed to ensure that it remains within the CETP's existing environmental approvals and treatment capacity.
The new protocol requires applications to be examined with reference to the Base Membership List submitted by the CETP when obtaining its CTE or CCA. The transfer must undergo public notice, technical evaluation and a decision by the Governing Body before the required membership and consent records are updated.
Why Has GPCB Introduced the New Hydraulic Load Transfer Rules?
Industries connected to CETPs may need to change their booked wastewater treatment capacity because of production adjustments, changes in operations, closure or other business requirements. Such changes can affect the allocation of treatment capacity among member industries and the information recorded in their environmental consents. The GPCB protocol establishes a common procedure for examining these transfers instead of leaving them to be handled without a defined evaluation process.
The protocol also addresses the environmental implications of transferring hydraulic load. A transfer should not increase the CETP's total consented capacity or cause an increase in the pollution load entering the treatment plant. These conditions are important because transferring an allocation between industries does not necessarily mean that the wastewater generated by both industries has the same characteristics.
The order also introduces a structured process for maintaining membership records and coordinating consent amendments. The main regulatory objectives are:
- Standardising applications for hydraulic load and membership transfers.
- Ensuring that CETP treatment capacity remains within existing consented limits.
- Preventing an increase in pollution load at the CETP inlet.
- Providing a technical review through the Regional Hydraulic Load Transfer Committee.
- Maintaining accurate and updated CETP membership records.
- Coordinating necessary CTE and CCA amendments for affected industries.
- Ensuring compliance with applicable environmental directions and regulatory requirements.
What Is Hydraulic Load Transfer in a Common Effluent Treatment Plant?
Hydraulic load transfer refers to the transfer of already allotted or booked wastewater treatment capacity from one industry to another within a Common Effluent Treatment Plant (CETP). The hydraulic load is generally measured in kilolitres per day (KLD).
Under the GPCB protocol, the transfer must meet the following requirements:
- An industry may propose to transfer part or all of its existing booked hydraulic load to another CETP member industry.
- The proposed transfer must be reviewed by the CETP Governing Body and evaluated by the Regional Hydraulic Load Transfer Committee (RHLTC).
- The transfer must not increase the CETP's total consented hydraulic capacity or the pollution load entering the treatment plant.
- Both the transferring and receiving industries must apply for the necessary amendments to their CTE and CCA.
- If an industry transfers its entire booked hydraulic load and surrenders its CETP membership, the CETP authority must ensure that its outlet is disconnected.
Who Must Comply with the GPCB CETP Hydraulic Load Transfer Protocol?
The office order applies to all CETPs operating in Gujarat and is relevant to industries seeking to transfer or receive allotted hydraulic load or CETP membership. It places responsibilities on the participating industries, the CETP Governing Body and the authorities involved in evaluating and updating the relevant records.
The protocol identifies the following participants:
- Transferor Industry: The industry transferring part or all of its allotted or booked hydraulic load to another industry.
- Transferee Industry: The industry receiving the transferred hydraulic load or CETP membership.
- CETP Governing Body: The highest decision-making authority of the CETP, such as its Board of Directors, Managing Committee or Board of Trustees.
- Regional Hydraulic Load Transfer Committee: The committee responsible for evaluating the proposed transfer and submitting recommendations.
- GPCB Regional Officer: The concerned regional representative of GPCB who participates in the evaluation process.
- Other Committee Members: Relevant industrial association representatives, applicable local authorities and an environmental auditing expert, as prescribed by the protocol.
Industries planning to transfer hydraulic load should first identify their existing allocation and consent conditions. CETP operators must ensure that proposals are examined according to the prescribed procedure before membership records are amended.
What Is the Base Membership List and Why Is It Important?
The Base Membership List is the membership list submitted by a CETP when obtaining its Consent to Establish or Consolidated Consent and Authorization. Under the GPCB protocol, requests for hydraulic load transfer or membership transfer must be considered with reference to this list. It serves as the starting record for identifying existing CETP members and maintaining changes in their membership details.
The protocol requires every change in the Base Membership List to follow the prescribed hydraulic load transfer procedure. Existing unique serial numbers and membership numbers must remain unchanged, including those of the transferor and transferee industries. Newly admitted industries must receive new numbers and be added to the end of the membership list.
Every updated membership list must also have a unique document version number and date of generation. The first revised list issued after the Base Membership List must be identified as Version 1.0. These requirements help CETPs maintain an identifiable record of membership changes.
Step-by-Step Procedure for Hydraulic Load Transfer in CETPs Under GPCB Rules 2026
The office order prescribes a procedure involving the member industries, CETP Governing Body, Regional Hydraulic Load Transfer Committee and GPCB. Applications are not treated solely as internal transfers between two industries. They must undergo technical consideration and the required regulatory amendments.
Step 1: Application to the CETP Governing Body
The industry or industries seeking a transfer must apply to the CETP Governing Body. The application should identify the proposed transfer of hydraulic load or membership so that the Governing Body can initiate the prescribed process.
Step 2: Publication of Public Notice
The CETP Governing Body must issue a public notice inviting objections to the proposed transfer. The order requires this step but does not prescribe a specific publication period or notice format.
Step 3: Forwarding of Application and Objections
The Governing Body must forward the application, along with any objections received, to the Regional Hydraulic Load Transfer Committee for evaluation.
Step 4: Technical Evaluation by RHLTC
The RHLTC must consider the proposed transfer at the earliest and examine its technical and environmental implications. This includes reviewing the CETP's consented hydraulic capacity, inlet pollution load, relevant consent conditions and applicable regulatory requirements.
Step 5: Submission of Committee Recommendations
After evaluation, the RHLTC must submit its recommendations to the CETP Governing Body. The recommendations must be properly recorded and signed by all committee members.
Step 6: Decision by CETP Governing Body
The Governing Body must consider the committee's recommendations and decide on the proposal. It must then make the necessary changes to the CETP Membership List.
Step 7: Submission of Updated Membership List
The updated Membership List must be submitted to GPCB in accordance with the requirements specified in the office order, including the reference to Annexure I.
Step 8: Issuance of Provisional Membership Certificate
The CETP Governing Body must issue a provisional membership certificate to the transferee industry.
Step 9: Applications for CTE and CCA Amendments
Both the transferor and transferee industries must apply to GPCB for the necessary amendments to their CTE and CCA.
Step 10: Disconnection Where Entire Load Is Transferred
If the transferor industry surrenders its CETP membership and transfers its entire booked hydraulic load, the CETP authority must ensure that the transferor industry's outlet is disconnected.
Step 11: Corresponding Consent Amendment
When issuing CCA to the transferee industry, GPCB must ensure that the corresponding CCA of the transferor has been amended or withdrawn, as required.
The order does not specify a fixed overall processing period. It requires the RHLTC to consider and evaluate applications at the earliest.
What Is the Regional Hydraulic Load Transfer Committee (RHLTC)?
The Regional Hydraulic Load Transfer Committee is the technical evaluation committee established under the GPCB protocol for reviewing proposed hydraulic load and membership transfers. The CETP Governing Body must constitute the committee at its level in coordination with the concerned GPCB Regional Officer.
The committee must include representatives of the CETP, GPCB, the participating industries and other designated stakeholders. It examines whether the proposed transfer complies with the environmental conditions specified in the office order and submits its recommendations to the CETP Governing Body.
Composition of the RHLTC
| Committee Member | Role or Representation |
|---|---|
| CETP CEO or highest-ranking Governing Body representative | Convener |
| Regional Officer, GPCB | Regulatory representative |
| Industrial association representative | One representative from the concerned association |
| Chief Officer of Notified Area Authority | Where applicable |
| Regional Manager, GIDC | Where applicable |
| Transferor and transferee industries | Owners or authorised representatives of both industries |
| Professor from a recognised educational institution | Schedule-I Environment Auditor representative selected by the GPCB Regional Officer |
The above members represent the minimum composition prescribed by the office order. The committee's recommendation must be recorded and signed by all its members before submission to the CETP Governing Body.
What Technical Conditions Must Be Satisfied for Hydraulic Load Transfer?
The GPCB protocol makes technical evaluation a central part of the transfer process. A proposed transfer cannot be considered only on the basis of an agreement between two-member industries. The RHLTC must examine whether the change remains within the CETP's approved environmental and operational limits.
The office order identifies five technical conditions that must be considered:
- No Increase in Consented Hydraulic Capacity: The total consented hydraulic capacity of the CETP must not increase after the transfer.
- No Increase in Inlet Pollution Load: The pollution load entering the CETP must not increase following the transfer of hydraulic load or membership.
- Review of CTE and CCA: The existing consents of both the transferor and transferee industries must be considered, with suitable amendments recommended.
- Compliance with Environmental Directions: The committee must consider prevailing environmental and regulatory requirements, including applicable directions issued by CPCB to State Pollution Control Boards under Section 18(1)(b) of the Water (Prevention and Control of Pollution) Act, 1974.
- Compliance with MoEFCC Notification: The committee must consider the responsibilities of CETP operating agencies and member industries under MoEFCC Notification S.O. 3864(E), dated 9 September 2024.
These conditions mean that the quantity of wastewater is not the only relevant factor. The pollution load and applicable consent requirements must also be considered before a transfer is recommended.
Does Hydraulic Load Transfer Allow an Increase in CETP Capacity?
No. The office order expressly requires that there must be no increase in the CETP's total consented hydraulic capacity following the hydraulic load or membership transfer. The procedure concerns redistribution of already allotted or booked hydraulic load, not an automatic increase in the treatment plant's authorised capacity.
For example, if a CETP has a total consented hydraulic capacity of 10 MLD, transferring an existing booked allocation between member industries must not increase that consented capacity. The RHLTC must also ensure that the proposed arrangement does not increase the pollution load entering the CETP.
The protocol should therefore not be treated as a substitute for any separate environmental approval that may be required for increasing treatment capacity or changing other consented conditions.
CTE and CCA Amendment Requirements Under the New GPCB Protocol
A hydraulic load transfer may affect the consent conditions of both participating industries. The GPCB order therefore requires the transferor and transferee to apply for necessary amendments in their Consent to Establish and Consolidated Consent and Authorization. The RHLTC must consider the existing CTE and CCA of both industries while evaluating the proposal and recommending appropriate changes.
The order also places a specific responsibility on GPCB when issuing CCA to the transferee. The Board must ensure that the transferor industry's corresponding CCA has been amended or withdrawn, as required. This helps maintain consistency between the transferred hydraulic allocation and the consent records of the affected industries.
| Industry | Main Responsibility |
|---|---|
| Transferor | Apply for necessary amendments to CTE and CCA |
| Transferee | Apply for necessary amendments to CTE and CCA |
| RHLTC | Review existing consents and recommend suitable amendments |
| CETP Governing Body | Decide on transfer and update membership records |
| GPCB | Ensure corresponding transferor CCA amendment or withdrawal when issuing transferee CCA |
Industries should not assume that a CETP Governing Body decision alone completes all regulatory requirements. The necessary consent amendments remain part of the prescribed process.
What Happens When an Industry Transfers Its Entire Hydraulic Load?
The GPCB protocol contains a specific requirement for situations where the transferor industry surrenders its CETP membership and transfers its entire booked hydraulic load to one or more other industries. In such cases, the CETP authority must ensure that the transferor industry's outlet has been disconnected.
This requirement is relevant because the transferor is giving up its booked hydraulic allocation and CETP membership. The disconnection requirement prevents the surrendered outlet from continuing to operate as though the original allocation remained available.
The order also requires the corresponding CCA of the transferor industry to be amended or withdrawn, as necessary, when GPCB issues CCA to the transferee. The protocol does not prescribe an identical outlet-disconnection requirement for every partial hydraulic load transfer.
New Rules for Updating CETP Membership Lists
Once the CETP Governing Body has considered the RHLTC recommendations and decided on a transfer, it must make the necessary amendments to the Membership List. The updated list must be submitted to GPCB, following the requirements stated in the office order.
The protocol introduces specific controls for maintaining membership numbers and version records. Existing members must retain their unique serial and membership numbers, while newly admitted industries must be given new numbers and entered at the end of the list.
| Membership Record Requirement | GPCB Instruction |
|---|---|
| Existing member serial numbers | Must not be altered |
| Existing membership numbers | Must not be altered |
| Transferor and transferee identification | Existing numbers must remain unchanged |
| Newly admitted industry | Assign new serial and membership numbers |
| Placement of new members | Add at the end of the list |
| Updated document | Assign a unique version number |
| Generation date | Must be recorded |
| First update after Base Membership List | Version 1.0 |
| Submission to GPCB | Required |
The protocol applies to any change in the Base Membership List. CETP authorities should therefore maintain clear records of each update and ensure that the current list reflects decisions taken through the prescribed process.
What Is the Provisional CETP Membership Certificate?
Under the new protocol, the CETP Governing Body must issue a provisional membership certificate to the transferee industry after completing the relevant decision-making and membership update stages.
The certificate serves as part of the transfer process, but the office order separately requires both participating industries to apply for the necessary CTE and CCA amendments. The provisional membership certificate should therefore not be treated as a replacement for GPCB consent amendments.
The office order does not prescribe a separate fee, fixed validity period or detailed certificate format for provisional membership. Businesses should follow the applicable CETP and GPCB requirements rather than assuming additional conditions that are not stated in the protocol.
Documents Required for CETP Hydraulic Load Transfer in Gujarat
The GPCB office order specifies the application, public notice, committee recommendations, updated Membership List, provisional membership certificate and consent amendment steps. However, it does not provide a complete application document checklist for industries seeking hydraulic load transfer.
Businesses preparing a proposal may need to organise the following information for review and processing:
| Document or Record | Purpose |
|---|---|
| Hydraulic load or membership transfer application | Initiate the proposed transfer |
| Existing CETP membership details | Establish current membership records |
| Base Membership List | Verify the original membership information |
| Existing CTE and CCA | Examine relevant consent conditions |
| Details of proposed hydraulic load transfer | Identify the allocation proposed to be transferred |
| Public notice and objections received | Support the prescribed review process |
| RHLTC recommendations | Record technical evaluation and recommendations |
| Updated Membership List | Reflect the decision and revised records |
| Provisional membership certificate | Record provisional membership of the transferee |
| CTE and CCA amendment applications | Obtain necessary regulatory changes |
This table is a practical document-preparation guide based on the process described in the order. It should not be read as an official exhaustive document checklist issued by GPCB.
Is There Any Fee or Processing Timeline for Hydraulic Load Transfer?
The GPCB office order does not prescribe a specific application fee for transferring hydraulic load or CETP membership. It also does not state a fixed processing period for completing the transfer or the associated CTE and CCA amendments.
The protocol requires the Regional Hydraulic Load Transfer Committee to consider and evaluate applications at the earliest. However, this instruction does not establish a guaranteed number of working days for approval.
Actual processing may depend on the proposed transfer, technical evaluation, objections received, required consent amendments and applicable administrative procedures. Businesses should confirm any relevant charges or procedural requirements with the CETP authority and GPCB rather than relying on an assumed standard fee or timeline.
Does the Protocol Apply to Existing CETP Members?
Yes. The protocol governs requests for hydraulic load or membership transfers by existing CETP member industries. It requires such requests to be considered against the Base Membership List maintained by the CETP.
The order also states that any change in the Base Membership List must follow the prescribed protocol. Accordingly, CETP authorities cannot treat a membership change involving the covered transfer process as merely an informal internal adjustment.
However, the office order does not direct every existing member industry to obtain fresh CETP membership or resubmit its CTE and CCA simply because the protocol has been introduced. The additional process becomes relevant where the proposed transfer or membership change falls within the order.
Regulatory Framework Behind the GPCB CETP Hydraulic Load Transfer Protocol
The office order requires the RHLTC to consider applicable environmental and regulatory requirements when evaluating hydraulic load transfer applications. It specifically refers to directions issued by the Central Pollution Control Board to State Pollution Control Boards under Section 18(1)(b) of the Water (Prevention and Control of Pollution) Act, 1974.
The protocol also refers to MoEFCC Notification S.O. 3864(E), dated 9 September 2024, concerning the roles and responsibilities of CETP operating agencies and member industries. These requirements must be considered as part of the technical evaluation.
The references make clear that the transfer process must remain consistent with prevailing environmental obligations. Approval of a hydraulic load transfer does not independently remove other applicable pollution control conditions.
Impact of the New GPCB CETP Guidelines on Industries
The new protocol creates a more structured process for industries seeking to transfer booked hydraulic load or CETP membership. Instead of relying only on an arrangement between the participating industries, the proposal must be examined by the relevant CETP and regulatory authorities.
For industries receiving additional hydraulic load, the process requires careful attention to consent amendments and the technical conditions associated with the transfer. Industries surrendering booked capacity must also ensure that their consent records reflect the change. Where the full allocation and membership are surrendered, outlet disconnection becomes an additional requirement.
The main practical implications include:
- Greater emphasis on documented membership transfer applications.
- Technical verification of hydraulic capacity and pollution load.
- Participation of GPCB and other relevant stakeholders in the evaluation process.
- Necessary consent amendments for both participating industries.
- Updated and version-controlled CETP membership records.
- Additional coordination between industries and CETP authorities.
- Clearer records of transferred hydraulic load and associated membership changes.
Common Mistakes Industries Should Avoid During Hydraulic Load Transfer
Industries may face compliance difficulties if they treat hydraulic load transfer as a commercial arrangement without completing the regulatory process. The GPCB order requires several steps before the relevant membership and consent records can be brought into alignment.
Businesses and CETP authorities should avoid the following mistakes:
- Transferring load without a formal application: The process must begin with an application to the CETP Governing Body.
- Skipping the public notice: The Governing Body must invite objections to the proposed transfer.
- Ignoring technical evaluation: The RHLTC must examine hydraulic capacity, pollution load and applicable environmental requirements.
- Increasing the CETP's consented capacity: A transfer must not increase the plant's total consented hydraulic capacity.
- Failing to apply for consent amendments: Both transferor and transferee industries must seek necessary CTE and CCA amendments.
- Changing existing membership numbers: Existing unique serial and membership numbers must remain unchanged.
- Failing to maintain version records: Updated Membership Lists must have a unique version number and date of generation.
- Ignoring outlet disconnection: Where an industry surrenders its membership and entire hydraulic allocation, the CETP authority must ensure that the transferor's outlet is disconnected.
What Happens if Industries Do Not Follow the GPCB Protocol?
The office order establishes a mandatory procedure for hydraulic load and membership transfers within the scope of the protocol. A transfer that does not follow these steps may leave the membership records and environmental consent conditions inconsistent with the proposed arrangement.
For example, if a transferee industry begins relying on a transferred allocation without obtaining the necessary consent amendments, its existing CTE or CCA may not reflect the changed arrangement. Similarly, failing to amend or withdraw the transferor's corresponding CCA can create inconsistencies in the regulatory records.
The office order does not prescribe a new monetary penalty or a specific enforcement action for every procedural violation. Any regulatory consequences would need to be determined under the applicable environmental laws, consent conditions and directions.
What Industries Should Do Next
Industries planning to transfer hydraulic load or CETP membership should review the new protocol before initiating the process. The first priority is to confirm the existing booked allocation, CETP membership information and relevant environmental consent conditions.
A practical compliance review should include the following steps:
- Check Existing CETP Membership: Verify the industry's membership number and booked hydraulic load against CETP records.
- Review Current CTE and CCA: Identify the consent conditions relevant to the proposed transfer.
- Discuss the Proposed Transfer: Coordinate with the other participating industry and the CETP Governing Body.
- Prepare the Transfer Application: Submit the request to the CETP Governing Body under the prescribed procedure.
- Follow Public Notice Requirements: Ensure that the application proceeds through the objection-invitation stage.
- Support Technical Evaluation: Provide relevant information required for the RHLTC's assessment.
- Review the Committee Recommendation: Confirm that the proposed transfer has been evaluated against the environmental conditions.
- Update Membership Records: Ensure that the CETP makes the required changes to its Membership List.
- Apply for CTE and CCA Amendments: Both participating industries must submit the necessary applications to GPCB.
- Complete Applicable Disconnection Requirements: Where the full booked load and membership are surrendered, ensure that the transferor outlet is disconnected.
Industries should maintain records of their applications, committee recommendations, membership updates and regulatory amendments for future compliance verification.
How Corpseed Can Help with Compliance?
Industries seeking to transfer CETP hydraulic load must consider several connected requirements, including membership records, technical evaluation and environmental consent amendments. Missing a step may result in delays or inconsistencies between the proposed allocation and the approvals held by the participating industries.
Corpseed provides environmental regulatory compliance services to businesses requiring assistance with pollution control board approvals, consent applications and related documentation.
- CETP Hydraulic Load Transfer Requirement Assessment: Corpseed can assist businesses in understanding the applicable transfer procedure and reviewing the existing hydraulic load allocation, CETP membership information and environmental consent conditions.
- GPCB CTE and CCA Amendment Assistance: Both transferor and transferee industries must apply for necessary consent amendments. Corpseed can provide documentation and application assistance for the relevant GPCB consent amendment processes.
- CETP Membership and Document Review: Corpseed can help businesses review existing membership information and prepare relevant records required for the proposed transfer, subject to the requirements of the CETP Governing Body and GPCB.
- Environmental Compliance Gap Assessment: Businesses may need to assess whether the proposed transfer is consistent with their existing consent conditions and the applicable pollution control requirements. Corpseed can assist in identifying compliance gaps requiring attention.
- Pollution Control Board Compliance Advisory: Corpseed's regulatory compliance consulting services can support businesses in understanding applicable GPCB requirements, procedural obligations and environmental consent conditions.
- Ongoing Environmental Compliance Support: Industries managing multiple environmental approvals may require assistance with consent amendments, regulatory changes and compliance records. Corpseed can help businesses organise and monitor these requirements.
The objective of professional compliance support is to help industries follow the applicable process, maintain accurate records and avoid preventable application or documentation errors. Technical recommendations and regulatory decisions remain with the designated CETP committee, Governing Body and GPCB.
Key Takeaways
- The Gujarat Pollution Control Board issued the CETP Hydraulic Load Transfer Protocol on 10 September 2026, with immediate effect for all CETPs in Gujarat.
- Industries seeking hydraulic load or membership transfers must apply to the CETP Governing Body, which must invite public objections and refer the proposal to the Regional Hydraulic Load Transfer Committee (RHLTC) for evaluation.
- The proposed transfer must not increase the CETP's total consented hydraulic capacity or inlet pollution load. The RHLTC must also review existing CTE, CCA and applicable environmental requirements.
- CETPs must update their Membership Lists, maintain the prescribed numbering and version-control details, and submit the revised records to GPCB. The transferee must receive a provisional membership certificate.
- Both transferor and transferee industries must apply for necessary CTE and CCA amendments. GPCB must ensure that the transferor's corresponding CCA is amended or withdrawn, as required, when issuing CCA to the transferee.
- Where an industry surrenders its CETP membership and transfers its entire booked hydraulic load, the CETP authority must ensure that the transferor's outlet is disconnected.
- The order does not specify new application fees, monetary penalties or a fixed processing timeline. Industries can seek professional environmental compliance support for consent amendments, documentation and transfer-related requirements.