Corpseed

BIS Extends Withdrawal Dates for Two Indian Standards to 2027

Department: Department of Consumer AffairsAuthority: Bureau of Indian Standards (BIS)Publish: Applicable: 27-10-2026Product Quality ComplianceSafety and Regulatory

Quick note

Below is the official summary and the reference document preview. Use โ€œOpen PDFโ€ for full screen view.

Schedule a Call Back

IN +91

750+ BIS certification assignments since 2018

Clients include Juki India, Nibav Lifts, Normet India, Hirotec India, Kito India, Technotorc Tools, N Steels, Agromach Engineering, Emerson Automation Solutions Intelligent Platforms, Intangles Lab, Deki Electronics, Emerson Process Management (India) (12 of 450+ served since 2018).

A few more clients we've served in this industry
Engineering and manufacturing
Juki India ยท Nibav Lifts ยท Normet India ยท Hirotec India ยท Kito India ยท Technotorc Tools ยท N Steels ยท Agromach Engineering
Electronics and technology
Emerson Automation Solutions Intelligent Platforms ยท Intangles Lab ยท Deki Electronics ยท Emerson Process Management (India) ยท Martelx Electronics ยท Waites Sensor Technologies ยท Fleetx Technologies ยท Comap India
Jewellery
Swarnmala Jewellers ยท Muktavali Jewellers ยท Omana Jewels ยท Escarl Jewels ยท Aahaana Mooguthi ยท Aparna Jewels ยท Arraa Gold ยท DV Jewellery
Pharma and healthcare
Radimage Healthcare India ยท Sonova Hearing India ยท Agfa Healthcare India
Energy and power
Bitek Solar ยท Sodion Energy ยท Essar Oil and Gas Exploration and Production
Chemicals and materials
Sreechem Resins ยท Appl GOR Plastics India ยท Global Colours and Chemicals
More clients
Nilkamal ยท Siddhartha Logistics ยท GHV Medical Anchor ยท Geepas India ยท Smarthome Solutions India ยท Lumiere Technologies ยท Tegamen Safety Products ยท Patel Agrotech ยท Abbie IT Mart ยท Aqua Water Systems (India) ยท Pentair Water Treatment ยท WIN the BUY BOX ยท TNY Services (India) ยท Silcom (PTY) ยท Zeal Medical
See our BIS certification service โ†’

Summary

The Bureau of Indian Standards issued the latest corrigendum under Rule 15(1) of the Bureau of Indian Standards Rules, 2018. The amendment revises two withdrawal dates mentioned in earlier Gazette notifications. These changes concern IS 3745:2006 and IS 2721:2003, which have been revised through the establishment of IS 3745:2024 and IS 2721:2025, respectively.

When BIS publishes a revised Indian Standard, the previous edition may remain in force for a specified period. This allows manufacturers, testing laboratories and other users to examine the revised requirements and plan necessary changes. The latest BIS notification extends the scheduled withdrawal of the two older standards by one year, providing additional time for businesses to review their technical specifications and associated documentation.

The corrigendum does not introduce a new Quality Control Order (QCO), change the technical specifications of either standard or independently create a new BIS certification requirement. Businesses should also distinguish the withdrawal date of an Indian Standard from the implementation deadline under an applicable BIS certification scheme. The two dates may be connected, but certification requirements must be checked against the relevant BIS directions and product-specific guidelines.

Key Details of the BIS Corrigendum 2026

The notification contains two amendments to earlier BIS standards notifications. Both changes relate to withdrawal dates recorded in the schedules of the respective notifications.

Particulars Details
Issuing Authority Bureau of Indian Standards (BIS)
Concerned Department Department of Consumer Affairs
Ministry Ministry of Consumer Affairs, Food and Public Distribution
Corrigendum Reference HQ-PUB-BIS (1628)
Corrigendum Date 27 October 2026
Gazette Issue Date 4 November 2026
Electronic Publication Date 7 November 2026
Gazette Identifier CG-DL-E-07112026-277764
Applicable Provision Rule 15(1), BIS Rules, 2018
Affected Earlier Standards IS 3745:2006 and IS 2721:2003
Revised Standards IS 3745:2024 and IS 2721:2025
Revised Withdrawal Dates 14 April 2027 and 10 June 2027

The corrigendum substitutes the previously specified dates in column (5) of the respective notification schedules. It does not expressly alter other entries, product specifications or technical requirements in those schedules.

Changes Introduced Under the Latest BIS Corrigendum

The BIS corrigendum dated 27 October 2026 contains two separate amendments. The first concerns yoke-type medical cylinder valve connections, while the second relates to galvanized steel chain-link fence fabric.

Extension of IS 3745:2006 Withdrawal Date to 14 April 2027

The first amendment concerns Notification Ref. HQ-PUB013/1/2020-PUB-BIS (1069), dated 22 October 2024, and Corrigendum Ref. HQ-PUB-BIS (1272), dated 20 June 2025.

The October 2024 notification established IS 3745:2024, titled Yoke Type Medical Cylinder Valve with Pin Index Connection (Third Revision), on 14 October 2024. The earlier edition, IS 3745:2006, titled Yoke Type Valve Connections for Small Medical Gas Cylinders - Specification (Second Revision), was originally scheduled for withdrawal on 14 April 2025.

Through the June 2025 corrigendum, the withdrawal date was subsequently extended to 14 April 2026. The latest BIS corrigendum replaces this date with 14 April 2027.

Particulars Details
Earlier Standard IS 3745:2006
Revised Standard IS 3745:2024
Revised Standard Established 14 October 2024
Original Withdrawal Date 14 April 2025
Previous Extended Date 14 April 2026
Latest Withdrawal Date 14 April 2027
Latest Extension One year

The revised withdrawal date is relevant to manufacturers, suppliers and testing organisations dealing with products covered by IS 3745. Businesses should review the edition currently used in product documentation, laboratory reports and applicable certification records.

BIS had also issued implementation guidance dated 31 December 2024 concerning the transition to IS 3745:2024. That guidance identified changes involving material compatibility, valve design, pressure-relief provisions, hydraulic burst pressure testing and endurance testing. A subsequent BIS circular dated 10 June 2025 extended the concurrent-running period and implementation deadline to 14 April 2026.

The October 2026 Gazette corrigendum further revises the standard's withdrawal date. However, businesses operating under BIS licences should verify the latest corresponding certification implementation instructions rather than assuming that the Gazette correction automatically amends every earlier operational direction.

Extension of IS 2721:2003 Withdrawal Date to 10 June 2027

The second amendment concerns Notification Ref. HQ-PUB013/1/2020-PUB-BIS (1391), dated 16 December 2025, published in the Gazette of India dated 24 December 2025.

The earlier notification established IS 2721:2025, titled Galvanized Polyvinyl Chloride (PVC), Polyolefin and Other Polymer-Coated Steel Chain Link Fence Fabric โ€” Specification (Third Revision), on 10 December 2025.

It also specified that IS 2721:2003, titled Galvanized Steel Chain Link Fence Fabric โ€” Specification (Second Revision), would be withdrawn on 10 June 2026.

The latest BIS corrigendum extends this withdrawal date to 10 June 2027.

Particulars Details
Earlier Standard IS 2721:2003
Revised Standard IS 2721:2025
Revised Standard Established 10 December 2025
Previous Withdrawal Date 10 June 2026
Latest Withdrawal Date 10 June 2027
Latest Extension One year

The change is relevant to manufacturers and suppliers that use IS 2721:2003 for product specifications, quality checks, procurement requirements or testing.

The revised edition's title refers to PVC, polyolefin and other polymer-coated steel chain-link fence fabric. Manufacturers should examine the actual technical provisions of IS 2721:2025 to determine how the revised standard applies to their products. The title alone is not sufficient to establish every technical change or product category covered.

The extension does not automatically change the requirements of existing customer contracts, government tenders or any independently applicable certification scheme.

Comparison of Previous and Revised BIS Withdrawal Deadlines

The following table summarises the changes made through the latest BIS standards update.

Earlier Standard Revised Edition Previous Deadline New Deadline Extension
IS 3745:2006 IS 3745:2024 14 April 2026 14 April 2027 1 year
IS 2721:2003 IS 2721:2025 10 June 2026 10 June 2027 1 year

Both revised standards were established before the latest corrigendum. The October 2026 amendment changes only the scheduled withdrawal dates of their earlier editions.

This distinction matters for manufacturers planning to switch to the revised standards. The existence of an additional transition period does not necessarily remove the need to meet requirements already imposed under applicable certification conditions, procurement arrangements or other regulatory directions.

Regulatory Framework Governing Revision and Withdrawal of Indian Standards

The Bureau of Indian Standards is responsible for establishing, reviewing, revising and withdrawing Indian Standards. Rule 15 of the BIS Rules, 2018 provides the legal framework for these activities. It also requires the establishment, revision, amendment and withdrawal of Indian Standards to be notified in the Official Gazette.

Indian Standards are periodically reviewed to determine whether their technical requirements remain appropriate. A standard may be revised to address developments in materials, testing procedures, production methods or other relevant technical matters.

When a revised edition is established, BIS may allow the previous edition to remain in force concurrently until its scheduled withdrawal. This provides a defined transition period during which businesses can assess the revised requirements.

However, the existence of an Indian Standard does not automatically make BIS certification mandatory. Under Rule 24 of the BIS Rules, 2018, Indian Standards are generally voluntary unless made binding through legislation, specific government orders or contractual requirements.

A Quality Control Order may separately require certain products to conform to specified Indian Standards and comply with an applicable conformity assessment scheme. Businesses must therefore assess both the relevant standards notification and any independently applicable mandatory certification requirements.

The latest BIS corrigendum concerns the withdrawal timetable of two standards. It should not be interpreted as introducing a new QCO or granting a general exemption from existing certification requirements.

Manufacturers and Businesses Affected by the BIS Update

The revised withdrawal dates may affect businesses that manufacture, test, procure or supply products falling within the relevant standards.

Business Category Potential Compliance Impact
Medical cylinder valve manufacturers Review IS 3745 transition requirements and relevant certification arrangements
Medical gas equipment suppliers Confirm applicable standard editions in product and supply documentation
Steel chain-link fence manufacturers Review continued use of IS 2721:2003 and transition to IS 2721:2025
Industrial fencing suppliers Check customer specifications, test reports and procurement conditions
Importers of covered products Verify relevant standards and independently applicable import requirements
Testing laboratories Confirm the standard edition and applicable testing or recognition scope
Contractors and procurement agencies Review technical specifications and contractual acceptance criteria
MSME manufacturers Plan documentation, testing and standards-transition activities where necessary

For medical cylinder valve manufacturers, the principal concern is whether their existing products, testing records and certification arrangements are aligned with the applicable version of IS 3745.

For steel chain-link fence manufacturers, the extension provides more time to assess the revised IS 2721:2025 specification and determine whether technical or documentary changes are needed.

Businesses should not assume that the corrigendum applies to all medical gas equipment or every category of industrial fencing. Its relevance depends on the scope of the two affected standards.

Corpseed can assist manufacturers and suppliers with BIS standards applicability reviews and guidance on relevant product certification requirements.

Implementation Timeline and Revised BIS Compliance Dates

The following timeline identifies the main developments relevant to the two standards.

Date Regulatory Development
14 October 2024 IS 3745:2024 established
22 October 2024 Original BIS notification (1069) issued
31 December 2024 BIS implementation guidance for IS 3745:2024 issued
14 April 2025 Original scheduled withdrawal of IS 3745:2006
10 June 2025 BIS circular extending the concurrent-running period for IS 3745 to April 2026
20 June 2025 Earlier BIS corrigendum (1272) issued
10 December 2025 IS 2721:2025 established
16 December 2025 BIS notification (1391) issued
14 April 2026 Previously extended withdrawal date for IS 3745:2006
10 June 2026 Previously scheduled withdrawal date for IS 2721:2003
27 October 2026 Latest BIS corrigendum (1628) issued
4 November 2026 Gazette issue date
7 November 2026 Gazette electronic publication date
14 April 2027 Revised withdrawal date for IS 3745:2006
10 June 2027 Revised withdrawal date for IS 2721:2003

One point requires particular attention. The October 2026 corrigendum was issued after both previously scheduled withdrawal dates had passed. While the document substitutes new dates in the earlier notifications, it does not expressly explain the treatment of certification, supply or other activities undertaken during the intervening period.

Businesses that relied on the earlier deadlines should verify the current BIS position where that period is material to their compliance status.

Manufacturers holding BIS licences should also check the latest applicable product-specific implementation circulars. A standards-withdrawal amendment and a certification implementation instruction should not be treated as interchangeable without confirmation.

Existing BIS Certification and Standards Compliance Requirements

The latest BIS notification changes withdrawal dates but does not independently amend existing product certification or regulatory requirements.

Businesses should continue reviewing the following areas where applicable.

Applicable Indian Standards and Product Specifications

Manufacturers must first identify the correct Indian Standard for their product. The relevant standard edition should be checked against the product's technical characteristics, intended use and any applicable contractual requirements. For products covered by IS 3745 or IS 2721, businesses should examine the revised editions and identify any changes that affect their manufacturing or testing arrangements.

BIS Certification and Licence Conditions

Where manufacturers already hold BIS certification, they should verify the conditions attached to their licences and the latest product-specific implementation guidance.

An extended withdrawal date does not automatically extend the validity of a BIS licence or eliminate requirements imposed through a separate certification direction. Manufacturers considering BIS product certification should first confirm whether the relevant product falls under a mandatory or voluntary certification arrangement.

Product Testing and Technical Documentation

Product testing may be required under applicable certification conditions or where a manufacturer needs evidence of conformity with a particular standard. Businesses should review testing records, inspection procedures, technical drawings, material specifications and quality-control documents to determine whether the correct edition is referenced.

Fresh testing should be undertaken only where required by the applicable standard, certification procedure, contractual obligation or relevant technical assessment.

Standard Mark and Product Labelling

Where a product is covered by a valid BIS certification arrangement, the use of the Standard Mark must follow the applicable scheme and licence conditions. The October 2026 corrigendum does not introduce new marking or labelling provisions for the affected products.

Import and Supply Compliance

Importers and distributors should review applicable Indian Standards and any separate mandatory certification requirements before supplying covered products. The revised withdrawal dates should not be treated as a general exemption from import controls, product conformity obligations or contractual specifications.

Compliance Preparation for the Extended BIS Withdrawal Dates

Manufacturers and suppliers should use the revised dates to examine their current compliance position and prepare for any necessary transition.

  1. Identify affected products: Determine whether the business manufactures, imports, tests or supplies products falling within IS 3745 or IS 2721.
  2. Review the revised Indian Standards: Obtain the applicable editions and examine changes in technical requirements, product scope and test procedures.
  3. Assess certification applicability: Check whether a relevant QCO, BIS licence condition or product-specific implementation circular applies to the product.
  4. Examine existing licences: Where BIS certification is held, review the current approved scope, applicable standards and any directions concerning transition to the revised edition.
  5. Review testing documentation: Check whether laboratory reports and quality records refer to the correct standard edition and remain appropriate for their intended purpose.
  6. Update technical records where necessary: Review drawings, product specifications, inspection records and supplier declarations to identify references requiring changes.
  7. Check customer and tender requirements: Confirm which standard edition is required under existing supply contracts and procurement conditions.
  8. Monitor further BIS directions: Review official BIS records and relevant implementation circulars before the revised withdrawal dates.

These activities can help businesses identify genuine compliance gaps without unnecessarily repeating testing or certification procedures.

Manufacturers requiring assistance with BIS certification services, standards applicability or product compliance documentation can contact Corpseed for a review of their regulatory requirements.

Impact of the BIS Withdrawal Date Extension on Manufacturers and Suppliers

The extended withdrawal dates may affect businesses differently depending on the products they manufacture, the standard editions currently used and their existing certification arrangements.

Medical Cylinder Valve Manufacturers

Manufacturers dealing with products under IS 3745 should examine the revised technical requirements and the latest BIS implementation instructions. The 2024 revision introduced changes identified in BIS implementation guidance, including material compatibility requirements, valve design provisions and certain testing procedures.

Businesses that have not completed a required standards transition should check their present certification status and the relevant BIS directions. The October 2026 corrigendum should not be relied upon as the sole basis for determining certification compliance.

Steel Chain-Link Fence Manufacturers

Manufacturers working with IS 2721:2003 may need to review product specifications, inspection records and customer documentation before the revised withdrawal date of 10 June 2027. Where the business intends to adopt IS 2721:2025, it should compare the technical requirements and verify how the revised standard applies to its product range.

Any necessary changes should be planned in accordance with actual technical requirements rather than assumptions based solely on the revised standard's title.

MSMEs and Small Manufacturers

Smaller manufacturers may need additional planning when a standard is revised, particularly where technical documentation, material specifications or testing arrangements require review. The extended withdrawal dates provide more time for assessment. However, businesses should not assume that every existing compliance obligation has been postponed.

A standards applicability review can help manufacturers identify the work that is necessary and avoid spending on irrelevant testing or certification activities.

Importers, Testing Laboratories and Procurement Teams

Importers should confirm which standard edition applies to their products and whether separate mandatory compliance requirements exist. Testing laboratories should verify the edition requested by clients and their ability or recognised scope to conduct the relevant testing.

Procurement teams should ensure that supply contracts and tender specifications identify the required standard edition clearly, particularly where both older and revised editions are referenced.

Consequences of Non-Compliance with Applicable BIS Requirements

Corrigendum HQ-PUB-BIS (1628) does not introduce new penalties, enforcement measures or restrictions on manufacturing and sales. However, businesses remain responsible for complying with any separately applicable mandatory certification requirements, BIS licence conditions and other binding regulatory provisions.

Where such obligations apply, failure to comply may lead to regulatory action under the relevant legislation or certification scheme. Incorrect standard references can also create commercial difficulties, including disputes over product specifications, testing documentation and contractual acceptance. Manufacturers should distinguish between a withdrawn Indian Standard and a product that is prohibited from manufacture or sale. Withdrawal of a standard does not, by itself, establish that every product made to the older edition is unlawful.

The legal position depends on the product, the relevant regulatory provisions, the certification scheme and any contractual conditions.

Important Considerations Before Switching to Revised Indian Standards

Manufacturers should not treat the revised withdrawal dates as the only factor in deciding when to adopt a newer Indian Standard. Before making changes, businesses should determine whether the revised edition covers the same product and whether its technical provisions affect the materials, manufacturing process or testing arrangements currently used.

They should also examine applicable BIS certification requirements and confirm whether the relevant certification authority has issued specific directions for implementing the revised standard. For businesses supplying products under long-term contracts, customer specifications may continue to reference an earlier edition. These references should be reviewed and updated where necessary through the appropriate contractual process.

Existing test reports, approved product specifications and internal quality records should also be checked. A change in the standard edition may require further technical evaluation, but it does not automatically mean that every previous report or approval must be replaced. Keeping standards-withdrawal dates, certification obligations and contractual requirements separate can help businesses make more accurate compliance decisions.

How Corpseed Can Assist with BIS Standards and Regulatory Compliance

Changes to Indian Standards can create uncertainty for manufacturers, particularly where revised technical specifications, certification procedures and withdrawal dates must be considered together. Businesses may need assistance identifying the applicable standard, understanding existing licence conditions and determining whether additional testing or documentation is required.

Corpseed provides BIS regulatory compliance assistance for businesses seeking guidance on applicable product standards and certification procedures.

Its support includes:

  • Standards Applicability Assessment: Reviewing the product category and identifying relevant Indian Standards and regulatory requirements.
  • BIS Certification Guidance: Helping manufacturers understand applicable certification schemes and requirements.
  • Documentation Assistance: Supporting the preparation and review of technical and business documents required for relevant applications.
  • Product Testing Coordination: Assisting with the identification of appropriate testing requirements and coordination where necessary.
  • BIS Licence Application Support: Helping eligible businesses prepare and submit applicable certification applications.
  • Standards Transition Guidance: Reviewing revised standards, withdrawal dates and relevant implementation instructions.
  • Ongoing Compliance Support: Assisting with applicable renewals, documentation changes and future regulatory requirements.

Corpseed follows a document-first approach and provides a single point of contact for coordinating applicable compliance activities, from initial assessment through application-related and subsequent support.

Need Assistance with BIS Certification or Standards Compliance?

Connect with Corpseed's compliance experts to review your applicable Indian Standards, understand BIS licence requirements and plan the necessary certification or documentation activities.

Book a Free Consultation | Request a Callback

Conclusion

The BIS corrigendum dated 27 October 2026 extends the scheduled withdrawal dates of IS 3745:2006 and IS 2721:2003 to 14 April 2027 and 10 June 2027, respectively. The amendment provides additional time for businesses to review the relevant revised Indian Standards and plan necessary changes to their technical and compliance records.

However, the extension does not introduce new BIS certification obligations or automatically modify existing licence conditions. Manufacturers and suppliers should verify the applicable standards, review relevant implementation guidance and assess any separate certification requirements before making compliance decisions.

For assistance with BIS standards applicability, product certification and regulatory compliance planning, businesses can contact Corpseed for professional guidance.

Document Preview

Embedded reference document

Fullscreen โ†—

Related

Explore more updates from the same department.

Call